Project Details

The Secretary of Indira Bahuddeshiya Education

Location At-post Ghatkheda Dist Amravati
Capacity Of plant 40 kW
Annual Production 12000 KWh
Reduction in Co2 Emission 29200 kg
Type of system installation On grid system
Date of Installation 16 September 2017
Panel 310 Wp Polycrystlline Panel ( Raajaratna )
Inverter 25 kw+ 15 kw

On grid system with 40 kw capacity